Client: Thames Water Farmoor
Contractor: Aquatic Engineering
Duration: March 2012 / 4 weeks
Date posted: 09-03-2012
Aquatic Engineering designed and fabricated a natural filtration system to be built, installed and tested at Farmoor Reservoir.
This involved the need for our divers to survey the site; drill and fix stainless eyebolts into the seabed; install weights and Platipus Anchors; install the large gabions and reed beds, then assembling the anchors to the floats and curtains.