    Aquatic Engineering designed and fabricated a natural filtration system to be built, installed and tested at Farmoor Reservoir.

    • survey the site
    • drill and fix stainless eyebolts into the seabed
    • install weights and platypus anchors

FILTRATION SYSTEM

Client: Thames Water Farmoor

Contractor: Aquatic Engineering

Duration: March 2012 / 4 weeks

Date posted: 09-03-2012

Aquatic Engineering designed and fabricated a natural filtration system to be built, installed and tested at Farmoor Reservoir.

This involved the need for our divers to survey the site; drill and fix stainless eyebolts into the seabed; install weights and Platipus Anchors; install the large gabions and reed beds, then assembling the anchors to the floats and curtains.

[Return to case studies]

Royal Institute Of Navigation Association of Diving Contractors UK Health and Safety Executive The Contractors Health and Safety Assessment Scheme Construction Line Royal Ocean Racing Club Royal Society for the Prevention of Accidents accredited Achilles UVDB Sea Start Offical Divers Buy With Confidence Sea Shield Approved Applicators HCL Clamping Solutions Joscar Registered