    Aquatic Engineering designed and fabricated a natural filtration system to be built, installed and tested at Farmoor Reservoir.

    • survey the site
    • drill and fix stainless eyebolts into the seabed
    • install weights and platypus anchors

FILTRATION SYSTEM

Client: Thames Water Farmoor

Contractor: Aquatic Engineering

Duration: March 2012 / 4 weeks

Date posted: 09-03-2012

Aquatic Engineering designed and fabricated a natural filtration system to be built, installed and tested at Farmoor Reservoir.

This involved the need for our divers to survey the site; drill and fix stainless eyebolts into the seabed; install weights and Platipus Anchors; install the large gabions and reed beds, then assembling the anchors to the floats and curtains.