    Limestone rock boulders were still partly submerged and wedged against the wall tightly together. Our dive team air lifted around these obstructions, stropping them individually and removing them from the area to enable the new sheet piles to be installed without hindrance.

POOLE HARBOUR EXCAVATION

Client: Poole Harbour Commision

Contractor: Raymond Brown Construction Ltd

Duration: 3 days

Date posted: 03-04-2013

Raymond Brown Construction Ltd have been working with the Poole Harbour port authorities to replace the deteriorating sheet pile wall just north of the chain ferry. This involved removing large areas of rock armour in front of the existing wall with their excavator. Once the area was cleared, there still remained a number of large obstructions they were unable to lift.

MMC Diving Services were called in to survey the site, concluding that a number of the limestone rock boulders were still partly submerged and wedged tightly together against the wall. Our dive team air lifted around these obstructions, stropping them individually and removing them from the area to enable the new sheet piles to be installed without hindrance.

[Return to case studies]

Royal Institute Of Navigation Association of Diving Contractors UK Health and Safety Executive The Contractors Health and Safety Assessment Scheme Construction Line Royal Ocean Racing Club Royal Society for the Prevention of Accidents accredited Achilles UVDB Sea Start Offical Divers Buy With Confidence Sea Shield Approved Applicators HCL Clamping Solutions Joscar Registered