  • Royal Fisheries Scour protection

    Network Rail required scour protection around the piers. Aquatic Engineering designed a containment curtain to encapsulate the works.

    • fabricating steel works
    • installing platypus anchors
    • topside & underwater burning
    • welding
    • insulation of rock armour and weaving

ROYAL FISHERIES SCOUR PROTECTION

Client: Network Rail

Contractor: Dyer and Butler

Duration: September 2012 / 14 Weeks

Date posted: 01-09-2012

Due to the fast flowing river, Network Rail required some scour protection around the piers. Aquatic Engineering designed a containment curtain to encapsulate the works.

Aquatic Engineering and MMC designed a deflector plate to divert 7000 cubic metres per second away from the working area, enabling works to be undertaken. This included fabricating the steelworks; installing Platipus Anchors; topside and underwater burning; welding; insulation of rock armor and weaving.

"Throughout working on the railway for the last 8 years, I have come across hundreds of small to medium size sub-contract organisations. The majority have been to a reasonable standard. I have to say the organisation that you run and operate is exemplary from the management, right down to the operatives. I also look forward to working with MMC on future projects. I will gladly recommend MMC to other major construction companies when attending safety forums."

(SHEQ Advisor)

[Return to case studies]

Royal Institute Of Navigation Association of Diving Contractors UK Health and Safety Executive The Contractors Health and Safety Assessment Scheme Construction Line Royal Ocean Racing Club Royal Society for the Prevention of Accidents accredited Achilles UVDB Sea Start Offical Divers Buy With Confidence Sea Shield Approved Applicators HCL Clamping Solutions Joscar Registered