  • Royal Fisheries Scour protection

    Network Rail required scour protection around the piers. Aquatic Engineering designed a containment curtain to encapsulate the works.

    • fabricating steel works
    • installing platypus anchors
    • topside & underwater burning
    • welding
    • insulation of rock armour and weaving

ROYAL FISHERIES SCOUR PROTECTION

Client: Network Rail

Contractor: Dyer and Butler

Duration: September 2012 / 14 Weeks

Date posted: 01-09-2012

Due to the fast flowing river, Network Rail required some scour protection around the piers. Aquatic Engineering designed a containment curtain to encapsulate the works.

Aquatic Engineering and MMC designed a deflector plate to divert 7000 cubic metres per second away from the working area, enabling works to be undertaken. This included fabricating the steelworks; installing Platipus Anchors; topside and underwater burning; welding; insulation of rock armor and weaving.

"Throughout working on the railway for the last 8 years, I have come across hundreds of small to medium size sub-contract organisations. The majority have been to a reasonable standard. I have to say the organisation that you run and operate is exemplary from the management, right down to the operatives. I also look forward to working with MMC on future projects. I will gladly recommend MMC to other major construction companies when attending safety forums."

(SHEQ Advisor)